Commercial solar and battery storage should be procured as one operating system, not as unrelated equipment packages. Across Europe, renewable generation has expanded faster in...
Energy Markets
Energy Parks for HGVs: The Charging Infrastructure Cannot Come Later
Heavy goods vehicle electrification depends on more than vehicle availability: it requires charging infrastructure designed around freight operations and the power system. HGVs...
BESS Warranties Need to Match How European Assets Are Actually Used
A battery warranty is only meaningful when its definitions match the way the asset will be dispatched. In April 2026, European BESS buyers were assessing systems intended for...
Gas Turbines and Peaking Plants: The Flexible Bridge Behind New Energy
Gas turbines and peaking plants can provide dispatchable capacity when weather changes, demand peaks or a connection is constrained. As solar and wind expand, that flexibility...
Ireland’s Solar Pipeline Needs Grid-Aware Procurement
For Irish solar and battery projects, grid capacity and connection requirements must shape equipment choices from the beginning. Export limits, protection settings, metering and...
2026 Solar and Storage Outlook: More Capacity, Less Room for Procurement Error
The European project pipeline entered 2026 with strong demand for solar modules, batteries and grid equipment. More offers do not automatically simplify procurement: they...
Renewable Energy Is the Foundation of AI Infrastructure: Martin O’Donnell in Shanghai
At the Irish Chamber of Commerce in Shanghai in January 2026, OGMA CEO Martin O’Donnell presented on renewable energy as a foundation of the AI economy. The event considered AI’s...
European Winter Trading Tests the Detail Behind Every BESS Warranty
European winter trading exposes a simple commercial truth about battery energy storage systems (BESS): revenue depends on an asset behaving within its technical limits, while the...
How a PPA Works for a 1 MW UK Solar and Battery Project
A Power Purchase Agreement (PPA) can make part of a UK solar project’s wholesale-market income more predictable, but it does not remove risk. It allocates price, volume,...